POLITON-ZP — polyurethane direct-to-metal primer-enamel (DTM)
Two-component primer-enamel with zinc phosphate: one coating instead of a primer and an enamel for C2–C5 atmospheres per ISO 12944, any RAL colour.

Paired with PLAMCOR-2, this material forms combined fire protection of steel structures for premises and locations under a canopy (placement categories 2, 3, 4 per GOST 15150). PLAMCOR-602 is a thermal insulation composition based on acrylic and chlorinated resins, structurally a syntactic foam; it is one-pack and requires no mixing of components. It is applied at temperatures from −15 to +30 °C. Service life of the system with PLAMCOR-2 is at least 25 years in categories 3–4 and at least 10 years in category 2.
| Manufacturer | VMP — AO “NPKh VMP”, Yekaterinburg |
|---|---|
| Application | steel structures |
| Service conditions | macroclimatic regions UKhL, KhL, atmosphere types I and II; placement categories 2, 3, 4 per GOST 15150 in a system with PLAMCOR-2 |
| Base | thermal insulation composition based on acrylic and chlorinated resins (syntactic foam), one-pack |
| Colour | light yellow (shade not standardised) |
| Packaging | 20 l metal buckets |
| Application method | airless spray (nozzle 0.015–0.021″, ≥ 25 MPa), brush/trowel |
| Application temperature | from −15 to +30 °C, relative humidity ≤ 80 % |
| Drying | to degree 3 — no more than 5 h; between coats — at least 4 h; full — at least 7 days (20 °C) |
| Compatible primers and topcoats | overcoated with intumescent PLAMCOR-2 or PLAMCOR-1; primers TSINEP, IZOLEP-primer, IZOLEP-mastic, VINIKOR-061, EVOPOL-12, GF-021 |
| Shelf life | 24 months |
| Standards | TU 20.30.22-133-12288779-2021; GOST 15150; GOST 9980.5; GOST 19007; GOST 25129; GOST 31992.1 |
Data from the manufacturer’s technical data sheet. The coating system, number of coats and quantity are selected for your project on request.
Two-component primer-enamel with zinc phosphate: one coating instead of a primer and an enamel for C2–C5 atmospheres per ISO 12944, any RAL colour.
Two-pack epoxy intumescent coating for steel structures in the open atmosphere, fire resistance rating up to 90 minutes.
High-build epoxy coating for tanks and pipelines with crude oil, fuel oil and bottom water; predicted service life 20 years.
Colourless vinyl varnish for priming the concrete of bridges and industrial structures under VINIKOR-62 enamel; overcoating after 2 h.
Epoxy coating for containers with crude oil, diesel fuel and oils in 1–2 coats; applied and cured from 0 °C.
High-build fast-drying epoxy primer for bridges, steel structures and oil and gas; categories C1–C5, CX and Im3 per GOST 34667.