BIRSS 59 S1 M1000 — non-shrink self-compacting concrete mix for grouting
Concrete mix with quartz and granite aggregates for grouting and anchoring equipment, repairing columns and joints; 100 MPa at 28 days.
The Grouts and anchoring section brings together materials for filling the space under equipment base plates, grouting joints of precast reinforced concrete and fixing anchor bolts, rebar starters, threaded rods and rails. Grouts go under bridge and column bearings, turbines, generators, compressors, pumps, presses and machine tools and are used in track concrete and for erecting wind turbine towers.
Press “Request a price” here or on any product card to get a price and a product selection. Tell us what is being installed or fixed, the gap under the base plate, the loads on the assembly — static, dynamic or vibration — the rod or rebar diameter and the substrate, the installation temperature and when the equipment must start running. We will pick products from the catalogue and prepare an offer.
Grouts and chemical anchors travel from Tashkent across all regions of Uzbekistan and the Republic of Karakalpakstan; buyers in Turkmenistan, Tajikistan and Kyrgyzstan receive shipments in their own countries. The offer specifies delivery terms to your site.
Concrete mix with quartz and granite aggregates for grouting and anchoring equipment, repairing columns and joints; 100 MPa at 28 days.
Flowable cementitious compound for crack injection, anchor fixing, grouting of bearings and soil stabilisation; water retention at least 98 %.
Rapid-hardening non-shrink mix for grouting columns, equipment and bridge bearings at air temperatures down to −10 °C.
Self-compacting cementitious mix for grouting equipment and steel structures, installing anchors and repair; 70 MPa compressive at 28 days.
Pourable fine-grained mix for grouting under equipment and steel structure supports, installing anchors and repair; bond 2.5 MPa.
High-strength non-shrink flowable R4 grout for anchors, equipment grouting and underwater concreting; 80 MPa at 28 days.
Thin-layer non-shrink flowable R4 grout for anchoring in small gaps and hard-to-reach places; aggregate up to 0.5 mm, 60 MPa.
Cementitious grout for installing equipment, columns, joints and anchors at low temperatures; 10 MPa after 6 hours at −10 °C, 50 MPa at 28 days.
Cementitious R4 grout for installing equipment, columns, joints and anchors at sub-zero temperatures; 15 MPa after 6 hours at −25 °C.
Cementitious grout for installing presses, machine tools, pumps and compressors, grouting under columns and repair by pouring; 60 MPa at 28 days.
Grout of cementitious mix and steel fibre for installing equipment, columns, bridges and airfields; flexural from 14 MPa, compressive from 60 MPa at 28 days.
Cementitious grout for installing equipment, column bases, joints and anchors; 70 MPa in compression at 28 days, W20, workability from 45 minutes.
Ultra-rapid-hardening R4 grout for equipment, anchors and sleepers in track concrete; 10 MPa in compression after just 2 hours.
High-strength flowable mix for grouting machine tools and equipment, installing anchors and filling joints in reinforced concrete; 80.0 MPa compressive after 28 days.
Flowable cementitious grout for high-precision grouting of equipment, anchor starter bars and joints; fibre already in the mix, 100 MPa compressive after 28 days.
Flowable epoxy grout for high-precision installation and anchoring of industrial equipment on foundations; effective contact area at least 85 %.
Low-viscosity R4 cementitious mix for filling the space under the rail slab of ballastless track, machine bases and bolts; 70 MPa at 28 days.
Acrylic resin grout for fixing equipment with dynamic loads and rails; applied at temperatures from −10 to +25 °C.
Two-component highly filled acrylic resin polymer concrete for bridge bearings, screeds and rails; at least 95 MPa compression after 4 hours.
Highly filled cold-curing epoxy for filling anchor pockets and grouting under turbines, compressors and pumps; 100 MPa in 7 days.
Two-component chemical anchor for rebar, studs and embedded parts in concrete, stone and brick at sub-zero temperatures; 410 ml cartridge.
Multi-purpose epoxy for anchoring bars, bolts and barrier posts, base plates and rails; compressive strength from 90 MPa in 7 days.
Three-component modified epoxy grout for base plates, bridges, rails and anchoring; the consistency is set by the proportion of filler.
High-strength three-component epoxy grout for bridge bearings, equipment and rails; 80 MPa after just one day in flowable consistency.
Two-component high-strength epoxy grout for bridge bearings, equipment, rails and anchoring; 27 kg kit, shelf life 16 months.
Two-component epoxy chemical anchor for bonding rebar, anchors and studs of any diameter into B15–B60 concrete, stone and brick.
Modified epoxy chemical anchor for rebar, studs and embedded parts in concrete, stone and brick; 380 ml coaxial cartridge.
Fibre-reinforced flowable mix for grouting under bridge bearings and equipment foundations and repairing roads and airfields; 50 MPa after one day.
Flowable fibre-reinforced R4 mix for fixing cables and pipes in chases and grouting joints and track concrete; 8 MPa compression after 1 hour.
Non-shrink low-viscosity R4 grout for machine bases and fixing beams, columns and bolts; from 35 MPa after one day and from 75 MPa at 28 days.
Non-shrink highly flowable cementitious mix for grouting machine bases, fixing beams and columns and setting anchors; 60 MPa at 28 days.
Grout in 19 kg bags for fixing sleepers in track concrete, installing railings and posts and fixing rebar; 10 MPa after 2 hours.
Low-viscosity non-shrink cementitious mix for high-precision grouting under columns, bridge spans and equipment foundations; 80 MPa at 28 days.
High-strength rapid-hardening Portland cement grout with shrinkage compensators for wind turbines, bridges and equipment; 110 MPa at 28 days.
Highly flowable expanding binder for shrinkage-compensated mortars and concrete: repair of roads, airfields, bridges and masonry; 20 kg bag.
Epoxy anchor for M8–M24 studs and rebar in dry concrete: fences, railings, gates, wall-mounted and building services equipment.
Epoxy bonded anchor for M8–M36 studs and rebar in cracked and non-cracked concrete, including water-filled holes; installation from −10 °C.
Rapid-hardening acrylate anchor for M8–M24 studs and rebar in dry concrete at substrate temperatures down to −25 °C; 300 ml tube.
Non-shrink epoxy grout under columns, equipment and bridge structures under static and dynamic loads; 100 MPa in 7 days.
Epoxy anchor for M8–M30 studs and rebar in cracked and non-cracked B25–B60 concrete, as well as in stone and brick; 385 ml cartridge.
Khimtrast epoxy anchor in a 450 ml cartridge for M8–M30 studs and rebar starters in concrete; installation at temperatures from 0 °C.
No materials match these filters.