FERROTAN — polyurethane enamel with micaceous iron oxide
Moisture-curing enamel with micaceous iron oxide — an intermediate coat over zinc primers for bridges, oil and gas, chemical plants and hydraulic structures.

A two-component polyurethane enamel that completes the waterproofing system for bridge superstructure slabs IZOLEP-WP-01 + IZOLEP-WP-11 + IZOLEP-WP-33. It is applied over the IZOLEP-WP-11 membrane not earlier than 24 h and not later than 3 days at 20 °C; the coating is resistant to weathering, including ultraviolet, and serves as a protective and decorative finish coat. The enamel gives a semi-gloss grey or light grey surface and is applied by airless spray without thinning, by brush or by roller.
| Manufacturer | VMP — AO “NPKh VMP”, Yekaterinburg |
|---|---|
| Type | polyurethane enamels |
| Use | bridges, concrete |
| Base | polyurethane, two-component (base and hardener) |
| Colour | grey or light grey; semi-gloss |
| Packaging | kit: base and hardener in metal pails |
| Application method | airless spray without thinning (nozzle 0.011–0.015″, at least 15 MPa), brush, roller (SOLV-EP up to 5 % by weight); base : hardener 100:33.3 by weight |
| Application temperature | from +5 to +30 °C, relative humidity max. 80 %; substrate at least 3 °C above the dew point; material at least +15 °C |
| Drying | to degree 3 — no more than 5 h at 20 °C; to the next coat of enamel — at least 12 h at 20 °C and humidity 65 %; pot life at least 1 h at 20 °C |
| Key properties | high decorative properties |
| Compatible materials | finish coat over IZOLEP-WP-11 waterproofing (holding time of IZOLEP-WP-11 at least 24 h and no more than 3 days at 20 °C); system IZOLEP-WP-01 + IZOLEP-WP-11 + IZOLEP-WP-33 |
| Shelf life | 12 months from the date of manufacture |
| Standards | TU 20.30.22-167-12288779-2025 |
Data from the manufacturer’s technical data sheet. The coating system, number of coats and quantity are selected for your project on request.
Moisture-curing enamel with micaceous iron oxide — an intermediate coat over zinc primers for bridges, oil and gas, chemical plants and hydraulic structures.
A factory material: epoxy powder that pipe plants spray onto a heated pipe as a single coat or as the first coat of a system.
High-build epoxy primer-enamel for ballast tanks, decks, hydraulic structures and pressure vessels; applied down to −10 °C.
Vinyl-epoxy finish enamel in RAL colours for bridges, steel structures and concrete; dark shades are applied down to −10 °C.
Colourless penetrating epoxy primer for concrete of bridges and structures: it strengthens the surface and serves as a base under epoxy enamels.
Cold galvanising compound for welded rolling-stock structures: allows resistance welding through a single coat without impairing the weld.