SK-REZERV — epoxy coating for the inner surface of oil tanks
Epoxy compound for internal protection of tanks with crude oil, fuel oil, oils and water, resistant to the stored product up to +90 °C.

The finish partner of the SNEZH-PRO 011M primer is a one-component alkyd-urethane enamel with a drier, gloss or semi-gloss, tinted to the RAL catalogue or to the customer’s sample. Its main purpose is the bodies and underframe equipment of railway rolling stock, transport structures and other metal surfaces; the coating is resistant to UV radiation. The enamel dries to degree 3 in 6 h at 20 °C (the red one in 8 h) or in 0.5 h at 60 °C, and the 011M + 111MU system is designed for UKhL1 and KhL1 climates and 8 years.
| Manufacturer | Snezhinskie Kraski — OOO “ZLKS”, Yekaterinburg |
|---|---|
| Type | anticorrosive material |
| Use | steel structures, equipment |
| Base | one-component alkyd-urethane with a drier |
| Colour | to the RAL catalogue or the customer’s sample; gloss or semi-gloss coating |
| Application method | air spray (working viscosity 30–50 s on VZ-246); airless spray (45–100 s); thinners — white spirit, xylene, solvent; 1–2 coats, wet-on-wet permitted |
| Application temperature | from +10 to +40 °C; relative humidity up to 80 %; surface not above +40 °C and 3 °C above the dew point |
| Drying | full cure 7 days |
| Compatible materials | over the SNEZH-PRO 011M primer |
| Shelf life | 12 months from the date of manufacture; storage from −40 to +40 °C |
| Standards | TU 2312-008-65119126-2005; GOST 7409-2018 |
Data from the manufacturer’s technical data sheet. The coating system, number of coats and quantity are selected for your project on request.
Epoxy compound for internal protection of tanks with crude oil, fuel oil, oils and water, resistant to the stored product up to +90 °C.
Matt acrylic primer-enamel for metal, concrete and reinforced concrete indoors and outdoors, coating service life 10 years.
Polyurethane topcoat to the RAL catalogue for tanks, pipelines and bridges, included in the OVP register of PJSC Transneft.
Matt or semi-matt primer-enamel for cranes, machine tools, power line towers and road machinery, applied over St 2 and old coatings.
Alkyd-modified primer for wagon bodies, transport structures and cranes, dries to degree 3 from 1.5 h at 20 °C.
Thermosetting polyurethane for pipeline fittings, valves and underground tanks, tack-free in max. 9 min.